1913 - Crewmen shift a Panama Canal Zone railroad by machine.
NEW
1913 - Laborers are moved into position for shifting a railway in the Panama Canal Zone.
NEW
1913 - Boats travel through the Panama Canal with and without the assistance of dredging fleets.
NEW
1913 - Blasting takes place on the Cucaracha slide during construction of the Panama Canal Zone.
NEW
1913 - Men build around a railway on the floor of the Culebra Cut by machine and hand.
NEW
1913 - A dredging fleet enters the Miraflores Locks at the Panama Canal.
NEW
1913 - Soil from dirt trains is unloaded with plows on the water fill at Fort Amador.
NEW
1913 - After a leveling machine has been used on a railroad by the Panama Canal, crewmen start shifting tracks by hand.
NEW
1913 - A small steamboat turns near the Panama Canal.
NEW
1913 - A dredging fleet escorts a smaller boat into the Panama Canal.
NEW
1913 - Mud and rocks are dredged from the water in the Panama Canal Zone.
NEW
1913 - Steam shovels are used to load dirt trains on the floor of the Culebra Cut as the Panama Canal Zone is under construction, and blasting takes place.
NEW
1913 - A train passes through power shovels working on the construction of the Panama Canal Zone.
NEW
1913 - Men stand atop the gates of the Panama Canal as they open for a dredging fleet, where men and women are passengers.
NEW
1913 - A dredging fleet and a small boat enter a chamber in the Panama Canal.
NEW
1913 - A steam shovel is used to load dirt trains on the floor of the Culebra Cut as the Panama Canal Zone is under construction.
NEW
1913 - View from a train traveling down the Culebra Cut while laborers work on the tracks at the Panama Canal Zone.
NEW
1913 - A dredging shovel is used on a boat for the construction of the Panama Canal.
NEW
1913 - Compressed air drills and steam shovels are used along the Culebra Cut in the construction of the Panama Canal Zone, where blasting also takes place.
NEW
1913 - Local construction workers build the gates of the Panama Canal.
NEW
1913 - A power shovel is used to move rocks from the floor of the Culebra Cut as the Panama Canal Zone is under construction.
NEW
1913 - A dredging fleet approaches the Gatun Locks on the Panama Canal.
NEW
1913 - Blasting takes place underwater and underground to clear space for the Panama Canal.
NEW
1913 - Myriad kinds of boats sail near the Panama Canal.
NEW
1913 - Water fills the Panama Canal.
NEW
1913 - Men clean up the debris after blasting takes place for construction of the Panama Canal.
NEW
1913 - View from a train crossing the dam at Gamboa on the Panama Canal.
NEW
1913 - Water is used to clear mud and rocks from a site planned for the Panama Canal.
NEW
1913 - Steam shovels are used to load dirt trains with rocks on the floor of the Culebra Cut as the Panama Canal Zone is under construction, and blasting takes place.
NEW
1913 - Dredging fleets clear the waterway that will become the Panama Canal.
NEW
1913 - Gates on the Panama Canal open for a dredging fleet.
NEW
1913 - A rowboat precedes a dredging fleet into the Gatun Locks of the Panama Canal.
NEW
1913 - A dredging fleet enters the lower chamber of the Gatun Locks on the Panama Canal.
NEW
1913 - A dredging fleet sails through the Miraflores Locks of the Panama Canal.
NEW
1913 - Crewmen remove railroad tracks from the floor of the Panama Canal Zone's Culebra Cut and also remove power shovels from the construction site.
NEW
1913 - A rocky ledge in the Culebra Cut is blasted for the Panama Canal Zone.
NEW
1913 - View from a boat approaching the locks on the Panama Canal.
NEW
1913 - Laborers leave the railroad yards at the Panama Canal construction zone.
1914 - The floodgates of the Panama Canal are put to the test by the dam torrent.
NEW
1913 - A man rows a small boat through the middle chamber of the Panama Canal, while the doors open to the lower chamber for another vessel.
NEW
1913 - A power shovels is used to load dirt trains with rocks on the floor of the Culebra Cut during construction of the Panama Canal Zone.
NEW
1913 - Trains travel through the Culebra Cut in the Panama Canal Zone.
NEW
1913 - A tugboat enters the Miraflores Locks of the Panama Canal.
NEW
1913 - A leveling machine is used to push dirt back from railroad tracks near the Panama Canal Zone, which is under construction.
NEW
1913 - A set of stairs are lowered from a bridge into the Panama Canal.
NEW
1913 - The lower gates are opened on the Gatun Locks of the Panama Canal, to allow a dredging fleet through.
NEW
1913 - A boat passes by an industrial facility near the Panama Canal, where a conveyor is operated by hydropower.
NEW
1913 - Panama Canal construction workers climb up the Culebra Cut.